Skip to content

India · Mon–Sat 09:00–18:00 IST

Tea & Coffee Products · PC-06

Green Coffee, Arabica & Robusta

Export-grade green coffee, screened, graded and packed in GrainPro liners with a moisture figure per lot.

HS code
0901.11 / 0901.12
MOQ
5 MT
Lead time
30 days from PO

01 / The product

What the specification covers.

Coffee is a hedged commodity, and Indian Arabica holds a genuine differentiation in high-grown lots. We supply both mainstream grades and specialty lots with traceability.

Beans are screened, graded, moisture-tested and packed in GrainPro liners, and the moisture and water activity figures travel with the shipment.

GrainPro Specialty available Traceable

At a glance

  • Arabica peaberry, Arabica bulk and Robusta
  • Specialty lots with farm-level traceability
  • GrainPro liners standard
  • Screen size and moisture declared

02 / Specification

Trade terms and technical detail.

These are the default terms for this product. Anything that matters to your process is written into the quotation and then into the purchase order.

HS code
0901.11 / 0901.12
Origin
Karnataka, Kerala & Tamil Nadu, India
Grade
Arabica Robusta grades
Packing
60 kg jute bags, GrainPro lined
MOQ
5 MT
Lead time
30 days from PO

Technical specifications

Moisture
10 – 12%
Water activity
≤ 0.55
Screen size
AA / AB / bulk
Defects
< 5% (arabica bulk)

Specification limits outside these values can usually be met. Send the standard you work to and we will confirm feasibility before quoting.

03 / Ordering

What ships with the goods.

Documents are prepared in-house and sent to you for approval before originals go to the bank or the carrier.

Documents for tea & coffee products

  • Cupping and tasting report
  • Certificate of analysis
  • Certificate of origin / Form A
  • Phytosanitary certificate

Additional certificates may be required by your destination. Tell us the port and the product use, and we will list what applies before the order is placed.

Order notes

Packing
60 kg jute bags, GrainPro lined
MOQ
5 MT
Lead time
30 days from PO

Lead time runs from purchase order and approved specification, not from enquiry. Freight transit is quoted separately.