Skip to content

India · Mon–Sat 09:00–18:00 IST

Grains & Pulses · PC-01

Yellow Peas & Kabuli Chickpeas

Whole and split pulses cleaned and sorted to a specification, cleaned in a dedicated pea line with metal detection.

HS code
0713.10 / 0713.20
MOQ
5 MT
Lead time
18 days from PO

01 / The product

What the specification covers.

Pulses are graded on count, split percentage, moisture and cooking time. We supply both whole and split (splitting ratio disclosed), in retail or food-service packaging.

Our suppliers run optical sorters and metal detectors, and we verify both during the pre-production audit rather than accepting a declaration.

पीली मटर · काबुली चना

Split Retail pack Gluten free

At a glance

  • Count 80/90 or 100/120, or by buyer specification
  • Split and whole available; split ratio declared on the COA
  • Optical sort plus metal detection on every line
  • Aflatoxin and residue testing available per lot

02 / Specification

Trade terms and technical detail.

These are the default terms for this product. Anything that matters to your process is written into the quotation and then into the purchase order.

HS code
0713.10 / 0713.20
Origin
Madhya Pradesh & Rajasthan, India
Grade
Whole, machine cleaned, sorted
Packing
25 / 50 kg PP bags, palletised
MOQ
5 MT
Lead time
18 days from PO

Technical specifications

Purity
≥ 99%
Moisture
≤ 12%
Foreign matter
< 0.3%
Aflatoxin B1
< 5 ppb (tested on request)

Specification limits outside these values can usually be met. Send the standard you work to and we will confirm feasibility before quoting.

03 / Ordering

What ships with the goods.

Documents are prepared in-house and sent to you for approval before originals go to the bank or the carrier.

Documents for grains & pulses

  • Certificate of analysis (COA)
  • Phytosanitary certificate
  • Certificate of origin
  • Fumigation certificate

Additional certificates may be required by your destination. Tell us the port and the product use, and we will list what applies before the order is placed.

Order notes

Packing
25 / 50 kg PP bags, palletised
MOQ
5 MT
Lead time
18 days from PO

Lead time runs from purchase order and approved specification, not from enquiry. Freight transit is quoted separately.